{"id":144,"date":"2020-11-02T12:50:53","date_gmt":"2020-11-02T12:50:53","guid":{"rendered":"https:\/\/arcosgroup.com.au\/?post_type=our_projects&p=144"},"modified":"2020-11-03T01:07:34","modified_gmt":"2020-11-03T01:07:34","slug":"waste-facility-structural-emergency-works","status":"publish","type":"our_projects","link":"https:\/\/arcosgroup.com.au\/our_projects\/waste-facility-structural-emergency-works\/","title":{"rendered":"Waste Facility Structural Emergency Works"},"content":{"rendered":"\n

The existing waste facility at Redcliffe had severe structural defects observed in a 7.5 m high retained section. Arcos were involved in undertaking detailed structural and geotechnical design of the remedial works and subsequent construction inspections. <\/p>\n","protected":false},"excerpt":{"rendered":"

The existing waste facility at Redcliffe had severe structural defects observed in a 7.5 m high retained section. Arcos were involved in undertaking detailed structural and geotechnical design of the remedial works and subsequent construction inspections. <\/p>\n","protected":false},"featured_media":151,"template":"","categories":[3],"acf":[],"_links":{"self":[{"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/our_projects\/144"}],"collection":[{"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/our_projects"}],"about":[{"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/types\/our_projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/media\/151"}],"wp:attachment":[{"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/media?parent=144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arcosgroup.com.au\/wp-json\/wp\/v2\/categories?post=144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}